|
28.01.2012, 02:16 | #1 |
Участник
|
emeadaxsupport: Microsoft Dynamics AX 2012 Upgrade - Using the State Transfer Tool
Источник: http://blogs.msdn.com/b/axsupport/ar...sfer-tool.aspx
============== Using the upgrade state transfer tool The upgrade checklist items for preparing data and preprocessing data are designed to run in the live production system, but some users will want a different option in order to prevent any additional pressure being placed on the production system. Additionally, users may want to gain extra benefit from their test runs to capture all of the data entered from forms found under the Prepare application data for preprocessing and take advantage of the test runs for the jobs under Preprocess data on the live system. The upgrade utility ships with a set of routines that allows all of the extra data created through the preparation and preprocessing steps to be transferred back into a database that has never run these steps. Instructions for using this process are listed in great detail in the Microsoft Dynamics AX 2012 Upgrade Guide, but will not be used in the course. Critical: In order to use the Upgrade state transfer tool, the decision to use the tool must be made BEFORE doing any of the data preparation or preprocessing steps in the live production database. If any of these steps have already been started in the live production system, the upgrade state transfer tool cannot be used. To find out how to use the upgrade state transfer tool, see Using the preprocessing upgrade state transfer tool or obtain the Microsoft Dynamics AX 2012 Upgrade Guide (http://www.microsoft.com/download/en/details.aspx?id=14599) from the Microsoft Download Center and search in the file for the section titled "Using the pre processing upgrade state transfer tool." Read through the entire section carefully for detailed information on how to setup the live production system and the test system to support running this process. Critical: We currently are missing an important step from our documentation about using the State Transfer tool. The steps for Performing Post-processing tasks is missing an item describing how to move/synchronize two Number Sequences created/modified by the pre-processing and delta scripts which must be manually moved to the production database copy. This will be addressed in a future version of the utility, but not released as a hotfix. The proper steps for Perform post-transfer tasks should be the following: Perform post-transfer tasks After the state transfer is complete, perform the following tasks.
Description CRM_1 Party numbers CRM_2 Location numbers
In addition to the steps listed in the Upgrade Guide, there are steps that will allow for multiple iterations of this process to be run between two test environments before a final transfer back to the live production environment. This scenario can be used if the user has very long cycles of time between testing their delta processing and new data is frequently added to the live production system. The steps listed here describe the process and should be used along with the more expanded directions in the upgrade guide:
4. In the first test environment, run through the prepare data for preprocessing forms and proceed through running the Live Preprocessing tasks.
The following illustration shows the workflow for using the state transfer tool in this iterative cycle. Источник: http://blogs.msdn.com/b/axsupport/ar...sfer-tool.aspx
__________________
Расскажите о новых и интересных блогах по Microsoft Dynamics, напишите личное сообщение администратору. |
|
|
Опции темы | Поиск в этой теме |
Опции просмотра | |
|