AXForum  
Вернуться   AXForum > Microsoft Dynamics AX > DAX Blogs
All
Забыли пароль?
Зарегистрироваться Правила Справка Пользователи Сообщения за день Поиск

 
 
Опции темы Поиск в этой теме Опции просмотра
Старый 22.09.2014, 18:11   #1  
Blog bot is offline
Blog bot
Участник
 
25,631 / 848 (80) +++++++
Регистрация: 28.10.2006
axmfg: Warehouse work for raw material picking split per route operation
Источник: http://blogs.msdn.com/b/axmfg/archiv...operation.aspx
==============

This new functionality is available with KB 2995227 and will be included in Microsoft Dynamics AX2012 R3 CU8. To find the HF you can use LCS Issue Search.

Whats new?

To support and efficient process for raw material picking in production, it is now possible to split warehouse work for raw material picking per route operation. As an example, this is useful in a so called bulk / pack production scenario. In this scenario there could be one operation for making the bulk material and one operation for bottling and packing. These two operations are both consuming materials, but will be carried out in different physical locations, maybe even different buildings. Splitting the work per operation will, in this case, secure a process where the warehouse worker is directed, by warehouse work, to deliver the picked materials to the exact locations, where the materials are consumed.

This blog will explain how this new capability is enabled by using the official demo data released for Microsoft Dynamics AX 2012 R3 CU8 Virtual Machine (VM).

In the company USPI there is a formula for making Pellets. This formula will be used for showing how this feature is enabled and used. The illustration below shows the Pellets production. The item numbers for the ingredients (or raw materials) as MW4004 - Polypropylene and MW4005 - Rubber are pre-fixed with MW and the four end items are pre-fixed with PW. PW4000 - Pellets is the formula item, and PW4001 – Chips and PW4002 - Blocks are co-roducts. PW4003 - Slag is a by-product.



As it can be seen in the illustration ingredients from the pellets production are consumed at two different operations. Let us see how work is now split per operation when releasing a batch order for the Pellets formula. First we create a batch order for Pellets and perform the following steps Estimate, Schedule and Release. In the Release step warehouse work is created





In the work details form it can be seen that two warehouse works has been created in the release step. The first work is for allocating materials to the extruder operation, which is the first operation in the route. The materials are allocated to the production input location: EXT



The next illustration shows the work details for the second work for the order. This work is for allocating materials to the Mixer operation. The materials are allocated to a production input location: MIX



Let us take a closer look how to enable this feature. First we need to setup the production input locations that will be applicable for the route operations. The Pellets formula has a production route with four operations



The first operation PPExtCut is consuming MW4004 - Polypropylene and MW4005 - Rubber. An applicable production input location for this operation is found through the Resource requirements for the operation. In the Resource requirements, criteria for finding an applicable resource or resource group during scheduling, is set up



The input location can be specified at the resource group but also on the relation between the resource group and the resource, as it can be seen in below illustration



In case no input locations can be found from the resource groups or resource group relations, then a default production input location is used as a fallback location. This default input location is setup on the warehouse



After setting up the input locations we need to specify which operations that are consuming which materials. This mapping is set up on the material lines using the field Oper. No. This is shown in the below illustration



If no operation is specified on the material line, then the production input location will be found from the resource group or resource group relation, applicable for the first operation in the production route. If no applicable input locations can be found, then the default output location for the warehouse is used. In below diagrams the defaulting hierarchy is shown. First diagram shows the rules that applies for finding the production input location for a material line that is mapped to the first route operation or does not have a location defined





Second diagram shows the rules that applies for finding the production input location for a material line that is not mapped to the first operation but to one of the following operations in the production route



In order to enable the split of warehouse work a minor change has been introduced to the work template for raw material picking. When a new template is created a Work break is automatically inserted. This work break is by the system configured to group work per route operation. It is possible to remove the work break, and in that case only one work will be generated when releasing to the warehouse from production. In that case the input location found from the first operation in the route will be used as production input location, and if none found on the route the default output location set up for the warehouse



If the hotfix is deployed to an existing installation, then the work template for raw material picking need to be recreated in order to establish the work break. An alternative is to insert the work break manually in the existing work template.

Again looking at the work details for the released batch order for pellets, we should now understand how the input locations for the two sets of work are found





Summary

In CU8 work for raw material picking can now be split per route operation. On the resource groups and the relation between the resource group and the resource it is possible to setup a production input location to be used in warehouse work. Installing this hotfix on an existing installation will require to recreate or update the work template for raw material picking. This new capability secures a more efficient picking process for production and batch orders, as the warehouse work will now direct the warehouse worker to the exact locations where the material is consumed.












Источник: http://blogs.msdn.com/b/axmfg/archiv...operation.aspx
__________________
Расскажите о новых и интересных блогах по Microsoft Dynamics, напишите личное сообщение администратору.
 

Похожие темы
Тема Автор Раздел Ответов Посл. сообщение
axmfg: Output location for the last operation in the production route Blog bot DAX Blogs 0 22.09.2014 18:11
axmfg: Replacing work order types for production output in CU8 Blog bot DAX Blogs 0 12.09.2014 18:12
DynamicsAxSCM: Combining wave containerization, work break and cluster picking to support a piece picking operation – AX2012R3 Blog bot DAX Blogs 0 27.08.2014 12:11
axmfg: Lean manufacturing: Picking activities and kanban line events Blog bot DAX Blogs 0 26.08.2014 21:13
DynamicsAxSCM: Monitor and analyse current and future warehouse space utilization with Dynamics AX 2012 R2 Blog bot DAX Blogs 1 13.12.2012 01:01

Ваши права в разделе
Вы не можете создавать новые темы
Вы не можете отвечать в темах
Вы не можете прикреплять вложения
Вы не можете редактировать свои сообщения

BB коды Вкл.
Смайлы Вкл.
[IMG] код Вкл.
HTML код Выкл.
Быстрый переход

Рейтинг@Mail.ru
Часовой пояс GMT +3, время: 09:11.